Manufacturing approval deserves a deliberate review. Resolve outstanding changes with support before accepting the current document package.
Verify the order identity
Check company, project and product details, especially when several projects are active. Match the code, finish and stone to the final selection.
Open a readable drawing
Use image zoom and the separate PDF files rather than relying on a small preview. Compare project details with the installer’s verified information. This article is not an engineering approval.
Keep revisions in the order record
A phone discussion should be reflected in the updated documents. Recheck the current version before approval. Changes after manufacturing begins may affect cost and timing, subject to company review.
Quick checklist
- Confirm the project and design code
- Review the latest documents
- Resolve questions before approval
General selection and ordering guidance. Technical decisions and manufacturing details require project-specific approval.
Sources & further reading
Based on the confirmed GrandCabin ordering workflow and design rules.



